Page 20
Kowloon Canton Railway.
BRITISH SECTION
ESTIMATE.
Main Head Bridges,
Sub. Head Major No.13.
C.R.E. No. 24.
Work Four 30' Arches Pier Abuts
C.R.E. No.1061.
Quantity DESCRIPTION Rate Unit AMOUNT 180 mt Excavation in founds. 10/- mt $1800.00 Timbering and Pumping. $2500.00 8550 Concrete in founds 35/m $2992.00 2000 Masonry in Footings. 40/- $800.00 20000 Superstructure. 40/- $8080.00 10950 Arches. 2/- a.ft. $21900.00 1100 Coping. $5300.00 Dry Stone Pitching. 2/- 0.ft. $2200.00 10/ 10% $530.00 Total $39502.50 Contingincies 10% $3950.25 Grand Total $43452.75Page 20
...
...
...
T
I
I
.VBWlisЯ notne neclwor
20.
(I
2017O3e Heftigia
.3TAMIrea
گھر
85
Pora C.R.E. No. 24.
Kowloon Canton Railway.
BRITISH SECTION
ESTIMATE.
115 beoff nisl
Main Head Bridges,
best du?
Sub. Head Major No.13.
10%
Avoi
Work Four 30' Arches Pier Abuts
C.R.E. No.1061.
AMOUNT.
Quantity.
DESCRIPTION.
Rate. Unit.
$
Cts.
180 mt
el e
*
5
#
م
50000
Excavation in founds.
10/-
500
"er
Item.
Timbering and Pumping.
2500
8550
2000
Concrete in founds
35/m
2992
Masonry in Footings.
40/-
800
20000
#
# Superstructure.
40/-
¿
Be
8080
10950
*
# Arghes.
2/-
a.ft.
21900
1100
Coping.
5300
Dry Stone Pitching.+
2/- 0.ft.
10/ 10%
2200
530
00
50
00
00
8 8 8 8 8 8 8 8
ft eoiatsušno)
lalo bnmo
Total
Contingincies 10%
Grand Total
39502 50
39 50 25
✓ $43452 75.
B