Kowloon Canton Railway.

BRITISH SECTION

ESTIMATE.

Main Head Bridges,

Sub. Head Major No.13.

C.R.E. No. 24.

Work Four 30' Arches Pier Abuts

C.R.E. No.1061.

Quantity DESCRIPTION Rate Unit AMOUNT 180 mt Excavation in founds. 10/- mt $1800.00 Timbering and Pumping. $2500.00 8550 Concrete in founds 35/m $2992.00 2000 Masonry in Footings. 40/- $800.00 20000 Superstructure. 40/- $8080.00 10950 Arches. 2/- a.ft. $21900.00 1100 Coping. $5300.00 Dry Stone Pitching. 2/- 0.ft. $2200.00 10/ 10% $530.00 Total $39502.50 Contingincies 10% $3950.25 Grand Total $43452.75

Page 20

...

...

...

Edit History

2026-06-04 21:19:32 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
Page 20 Kowloon Canton Railway. BRITISH SECTION ESTIMATE. Main Head Bridges, Sub. Head Major No.13. C.R.E. No. 24. Work Four 30' Arches Pier Abuts C.R.E. No.1061. Quantity DESCRIPTION Rate Unit AMOUNT 180 mt Excavation in founds. 10/- mt $1800.00 Timbering and Pumping. $2500.00 8550 Concrete in founds 35/m $2992.00 2000 Masonry in Footings. 40/- $800.00 20000 Superstructure. 40/- $8080.00 10950 Arches. 2/- a.ft. $21900.00 1100 Coping. $5300.00 Dry Stone Pitching. 2/- 0.ft. $2200.00 10/ 10% $530.00 Total $39502.50 Contingincies 10% $3950.25 Grand Total $43452.75 Page 20 ... ... ...
Baseline (Original)
T I I .VBWlisЯ notne neclwor 20. (I 2017O3e Heftigia .3TAMIrea گھر 85 Pora C.R.E. No. 24. Kowloon Canton Railway. BRITISH SECTION ESTIMATE. 115 beoff nisl Main Head Bridges, best du? Sub. Head Major No.13. 10% Avoi Work Four 30' Arches Pier Abuts C.R.E. No.1061. AMOUNT. Quantity. DESCRIPTION. Rate. Unit. $ Cts. 180 mt el e * 5 # م 50000 Excavation in founds. 10/- 500 "er Item. Timbering and Pumping. 2500 8550 2000 Concrete in founds 35/m 2992 Masonry in Footings. 40/- 800 20000 # # Superstructure. 40/- ¿ Be 8080 10950 * # Arghes. 2/- a.ft. 21900 1100 Coping. 5300 Dry Stone Pitching.+ 2/- 0.ft. 10/ 10% 2200 530 00 50 00 00 8 8 8 8 8 8 8 8 ft eoiatsušno) lalo bnmo Total Contingincies 10% Grand Total 39502 50 39 50 25 $43452 75. B
2026-06-04 21:19:32 · Baseline
View content

T

I

I

.VBWlisЯ notne neclwor

20.

(I

2017O3e Heftigia

.3TAMIrea

گھر

85

Pora C.R.E. No. 24.

Kowloon Canton Railway.

BRITISH SECTION

ESTIMATE.

115 beoff nisl

Main Head Bridges,

best du?

Sub. Head Major No.13.

10%

Avoi

Work Four 30' Arches Pier Abuts

C.R.E. No.1061.

AMOUNT.

Quantity.

DESCRIPTION.

Rate. Unit.

$

Cts.

180 mt

el e

*

5

#

م

50000

Excavation in founds.

10/-

500

"er

Item.

Timbering and Pumping.

2500

8550

2000

Concrete in founds

35/m

2992

Masonry in Footings.

40/-

800

20000

#

# Superstructure.

40/-

¿

Be

8080

10950

*

# Arghes.

2/-

a.ft.

21900

1100

Coping.

5300

Dry Stone Pitching.+

2/- 0.ft.

10/ 10%

2200

530

00

50

00

00

8 8 8 8 8 8 8 8

ft eoiatsušno)

lalo bnmo

Total

Contingincies 10%

Grand Total

39502 50

39 50 25

✓ $43452 75.